Bathroom renovation checklist for Adelaide homes
Work out what stays, what moves and what to ask about waterproofing, finishes and access before you get a bathroom renovation quote.
Decide what needs to change
Start with what bothers you in the room today. Storage and lighting can often be addressed while keeping the basic layout. If getting into the shower is difficult or the vanity door blocks circulation, test a different layout on paper. Mark where the door swings, where towels will hang and how far a drawer needs to open before choosing fixtures.
Quote the layout before buying fittings
Ask your builder to compare keeping the toilet and shower where they are with moving them. Relocating a waste can change the work below the floor, and access to it varies between homes. Share product dimensions and installation sheets for any vanity, tapware or screen you already have in mind. Confirm clearances and who checks compatibility before placing orders.
Ask how hidden conditions will be handled
If there has been a leak, loose tile or swelling at a doorway, show the builder where it appeared and when. Ask what the quote includes for demolition, substrate repairs, waterproofing, tiling and ventilation, and what happens if more damage is found after removal. Confirm how extra work would be priced and approved before it proceeds.
Plan for the room to be out of use
If it’s your only bathroom, ask when the toilet and shower will be unavailable and whether the work can be staged. Agree on trade access, where materials can be stored and who takes away the waste. Ask what needs to be selected and on site before demolition starts.